Lewis & Clark Regional Water System - TWP Segment - IA-3 (483rd Avenue, SD to Dogwood Avenue, IA)
- BAI Number
- 20000.40.21
- Pre-Bid Meeting Date:
- 06/18/2019 2:00 PM CDT
- Pre-Bid Meeting Location:
- Lewis & Clark Regional Water System Office, 46986 Monty Street, Tea, SD 57064
- Project Bid Date:
- 06/25/2019 2:00 PM CDT
- Project Bid Location:
- Lewis & Clark Regional Water System, 46986 Monty Street, Tea, SD 57064
Bid Schedule(s)
- Bid Schedule1
- Unit Price Bid Schedule
- Probable Cost 1
- $12,000,000.00 to $14,000,000.00
Scope of Work 1
Base Bid (Station 846+70 to 1512+00) - Approximately 66,530 linear feet of 24” diameter buried steel or ductile iron pipe (this pipe length includes the 2,560 feet Big Sioux River crossing and 1,830 feet of small drainage and other crossings using horizontal directional drilling techniques) and approximately 600 linear feet of jacked or bored highway and railroad crossing casing pipe (36” or 42” diameter);
Miscellaneous appurtenances including direct bury gate valves, isolation valves and combination air valves (including concrete vaults), and blow-off assemblies;
Relocation of existing small diameter rural water lines;
Temporary and permanent erosion control, fencing, reclamation and seeding;
Impressed current cathodic protection systems, joint bonds, and test stations;
Corrosion protection system components including galvanic anodes, coating and linings;
Traffic control during construction;
Pigging, flushing and hydrostatic pressure testing of Pipeline Segment TWP IA-3;
Pigging and flushing of Pipeline Segments TWP-12 and TWP IA-2;
Flushing of Pipeline Segments TWP-11 (east of the Beresford meter building) and TWP IA-1 and the Hull and Sioux Center Service Lines;
Disinfection of Pipeline Segments TWP-11 (east of the Beresford meter building), TWP-12, TWP IA-3, TWP IA-2, TWP IA-1 and the Hull and Sioux Center Service Lines; and
Clean up and all other miscellaneous work required, not herein mentioned, but inferred from the construction contract documents.
Addendum Dates
- 06/20/2019 Memo Faxed - Click here to download
Additional Files
- TWP-12 Geotechnical Report Dated 9/28/10 (05/21/2019)
- TWP IA-2 Geotechnical Report Dated 1/6/11 (05/28/2019)
- Supplemental Test Boring - River Crossing Dated 4/4/11 (05/28/2019)
- Test Boring - 298th Street (Finnie Creek) Dated 7/30/18 (05/28/2019)
- Test Boring - Big Sioux River East Side Dated 1/22/19 (05/28/2019)
- Test Boring - Big Sioux River West Side Date 2/8/19 (05/28/2019)
- Phase 1 Site Assessment for TWP-12 (Geotek #10-964) (05/28/2019)
- Phase 1 Site Assessment for TWP-IA-2 (Geotek #10-789) (05/28/2019)
Contact Persons:
- Dennis Odens - email, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;
- Scott Vander Meulen - email, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;
- Contact us about this project