Aurora-Brule Rural Water System - Water System Improvements
- BAI Number
- #22821.00.00
- Project Bid Date:
- 08/21/2019 11:00 AM CST
- Project Bid Location:
- Aurora-Brule Rural Water System, Inc., 117 2nd Street, Kimball, SD 57355
Bid Schedule(s)
- Bid Schedule1
- Unit Price Bid Schedule
- Probable Cost 1
- $600,000.00 to $800,000.00
Project Deadlines 1
- Substantial Completion
- 08/31/2020
- Final Completion
- 09/30/2020
Scope of Work 1
Construction of approximately 5,300 linear feet of 14-inch diameter water main;
Construction of approximately 13,000 linear feet of 6-inch diameter water main;
Construction of approximately 5,500 linear feet of 4-inch diameter water main;
Installation of a 6” wet tap and necessary fittings into existing 10” PVC water main;
Furnish and installation of necessary tracer wire, valves, fittings, joint restraints and concrete thrust blocks to provide a complete and functioning potable water main;
Furnish, transport and install a pre-fabricated pump vault and connect to existing piping systems near Ola, SD. Vault to include two (2) pumps, all mechanical, electrical and control equipment necessary to provide a fully functioning facility;
Temporary and permanent erosion control, reclamation and seeding;
Water main flushing, hydrostatic pressure testing and disinfection; and
Clean up, startup services, and all other miscellaneous work required but not herein mentioned but inferred from the construction Contract Documents.
Addendum Dates
- 08/16/2019 Memo Faxed - Click here to download