Project Information

Lewis & Clark Regional Water System-Treated Water Pipeline Segment 12 (Beresford, SD to Spur Avenue)

BAI Number
20000.38.01
Pre-Bid Meeting Date:
08/09/2018 2:00 PM CDT
Pre-Bid Meeting Location:
Lewis & Clark Regional Water System Office, 46986 Monty Street, Tea, SD 57064
Project Bid Date:
08/21/2018 2:00 PM CDT
Project Bid Location:
Lewis & Clark Regional Water System Office, 46986 Monty Street, Tea, SD 57064

Bid Schedule(s)

Scope of Work 1

BASE BID PROBABLE COST - $10,000,000 to $12,000,000

BID ALTERNATE PROBABLE COST - $4,000,000 to $5,000,000

Base Bid - Approximately 59,109 linear feet of 24” diameter buried steel, ductile iron or PVC pipe and approximately 1,070 linear feet of jacked or bored highway and railroad crossing casing pipe (diameter varies from 36” to 42” diameter casing pipe, depending upon type of pipe material used);
Bid Alternate - Approximately 19,820 linear feet of 24” diameter buried steel or ductile iron pipe and approximately 470 linear feet of jacked or bored highway and railroad crossing casing pipe (diameter varies from 36” to 42” diameter casing pipe, depending upon type of pipe material used);
Miscellaneous appurtenances including direct bury gate valves, isolation valves and combination air valves (including concrete vaults), and blow-off assemblies;
Temporary and permanent erosion control, fencing, reclamation and seeding;
Corrosion protection system components including galvanic anodes, coating and linings;
Traffic control during construction;
Pipeline hydrostatic pressure testing and cleaning; and
Clean up and all other miscellaneous work required, not herein mentioned, but inferred from the construction contract documents.

Addendum Dates

Additional Files

Contact Persons: