Project Details

The collector well is a vertical caisson with horizontal screens at the bottom pushed out into the aquifer. On top of the caisson there is the pump station with vertical turbine pumps. The building is supported by buttresses attached to the caisson so the building will not move relative to the caisson. Banner performed the design of the buttresses up through the design of the building. (Contractor was responsible for the caisson design)

Banner's role:

  • Project Management
  • Structural Design
  • Architectural Design