Twin Brooks's existing water operator wanted to retire and it was difficult to find a new licensed operator. In addition, Twin Brooks's existing wells were deteriorating. A Facility Plan was completed with the assistance of a Small Community Planning Grant and funding from East Dakota Water Development District. The Facility Plan recommended connection to the nearby Grant Roberts Rural Water System, which offered better water quality and was willing to take over maintenance of the City's water distribution system. The City's wells were abandoned and 2,245' of 6" water main was installed to connect the community to the rural water system. The project also included a pressure reducing/metering building with chemical feed as well as meter pits at each of the 39 connections within the community. Twin Brooks was able to receive $349,400 in grant funding for the project to assist with the cost of Facility Plan preparation, engineering design, construction, and construction observation, minimizing the financial burden on the community.
Project Goal # 1
Provide safe and reliable drinking water to the residents of Twin Brooks
Project Goal # 2
Eliminate the City's burden of operating and maintaining their own water system
Project Features
- $6,000 Small Community Planning Grant - Covered 80% of the study costs
- $750 East Dakota Water Development District Grant
- $212,900 SRF Grant
- $50,000 SRF Low-interest loan
- $136,500 CDBG Grant
Services Provided
- Facility Plan
- Prepared Final Design Plans, Specifications and Bidding Documents
- Construction Contract Administration
- Construction Observation