Southeast Lake Drive Wastewater System Expansion

Southeast Lake Drive Wastewater System Expansion

Location

Lake Poinsett, SD

Previous Next

The Lake Poinsett Sanitary District continued toward their goal of providing sanitary sewer collection and treatment to properties surrounding the lake by completing the Southeast Lake Drive portion of their construction plan. The project area is located along the southeast corner of Lake Poinsett and provides sewer service to an additional 90 customers. The work included three main lift stations; over four miles of gravity sewer pipe, force main, and sewer service lines; and several individual grinder stations. To accommodate the increased wastewater flow, an additional wastewater stabilization pond was constructed adjacent to an existing facility.

Checkmark Icon

Project Goal #1

Expand the Lake Poinsett Sanitary District sewer collection system

Checkmark Icon

Project Goal #2

Help reduce lake pollution

Project Features

  • Construction of total retention stabilization pond with clay liner
  • Gravity sanitary sewer grey water system
  • Septic tanks
  • Main lift stations with submersible pumps
  • Pressure force main
  • Individual grinder pump stations

Services Provided

  • Facility Plan Preparation
  • Topographic Surveying
  • Hydraulic Analysis
  • Preliminary / Final Design
  • Bidding Services
  • Construction Contract Administration
  • Construction Staking and Observation

Support Disciplines