Aurora Wastewater Facility Improvements

Aurora Wastewater Facility Improvements

Location

Aurora, SD

Previous Next

This project included construction of 2-cell stabilization pond system and conversion of the existing stabilization pond to a constructed wetland. In addition to these items, a new lift station and forcemain were constructed to accommodate the new location of the ponds. All interpond piping, valves, and structures were included in the project to allow the necessary movement of the water between stabilization ponds and constructed wetland.

Checkmark Icon

Project Goal #1

Complete the work while maintaining operation of the existing facilities

Checkmark Icon

Project Goal #2

Maintain compliance with the City's discharge permit

Checkmark Icon

Project Goal #3

Accommodate existing and future hydraulic and loading conditions

Project Features

  • Construction of two (2) lagoon cells
  • Construction of a constructed wetland
  • Submersible duplex lift station and valve vault
  • 2,500 L.F. 4” diameter lift station piping

Services Provided

  • Funding assistance
  • Topographic and Legal Surveys
  • Land Acquisition Recommendations and Assistance
  • Preliminary Site Planning and Facility Plan
  • Construction Documents
  • Bidding Services
  • Permitting
  • Construction Contract Administration
  • Construction Staking and Observation

Support Disciplines