WEB Redfield Booster Station
Project number: 23033.00.00
- Pre-Bid Meeting Date:
- 01/06/2020 1:00 PM CDT
- Pre-Bid Meeting Location:
- WEB Water Development Association Office, 38456 W US Hwy 12, Aberdeen, SD 57401
- Project Bid Date:
- 01/13/2020 2:00 PM CDT
- Project Bid Location:
- WEB Water Development Association Office, 38456 W US Hwy 12, Aberdeen, SD 57401
Bid Schedule(s)
- Type 1
- Probable Cost 1
- to
Project Deadlines 1
- Substantial Completion
- 12/18/2020
- Final Completion
- 01/29/2021
Scope of Work 1
PROBABLE COST FOR BASE BID: $1,500,000 TO $2,000,000
PROBABLE COST FOR BID ALTERNATE 1: $80,000 TO $120,000
One pump station (constructed on-site);
Pump station building construction consists of precast concrete wall panels, hollow core roof structure, and membrane roofing;
All pumps, piping, fittings, flow meters, transmitters, gauges, combination air valves, pressure relief valves, check valves, and telemetry & control system to provide a complete and functioning pump station;
Two (2) vertical turbine pumps with suction vessels and a third suction vessel for a future pump;
All electrical and mechanical systems including a standby generator;
PVC and ductile iron piping connections on inlet and outlet sides of the pump station including fittings, valves, joint restraints, cathodic protection, and concrete thrust blocking;
Site work including, but not limited to, excavation, fill, grading, access road construction, erosion control, and site top-soiling, seeding and restoration;
Installation and wiring of control panel and communications equipment furnished by Owner’s System Integrator (Micro-Comm, Inc.); and
Clean-up and all other miscellaneous work required, not herein mentioned, but inferred from the construction contract documents.
Bid Alternate No. 1: Furnish and install a third vertical turbine pump and VFD, and all necessary equipment and labor to provide a fully functioning third pump as required by the project plans and specifications.
Addendum Dates
- 12/26/2019 Memo Faxed - Click here to download
- 01/08/2020 Memo Faxed - Click here to download
Additional Files
- Geotechnical Report (12/17/2019)
Contact Persons:
- Architectural - Dave Lorang, Banner Associates.Inc. , (605) 692-6342 or 1-855-323-6342; cell # (605) 929-5554, davel@bannerassociates.com
- Process - Bryan Lipp, Banner Associates, Inc. (Brookings Office), (605) 692-6342 or 1-855-323-6342, bryanl@bannerassociates.com
- Structural - Adam Hanson, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;, adamh@bannerassociates.com
- Civil - Justin Bucher, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;, justinb@bannerassociates,com
- Mechanical - Isaac Anderson. PE, West Plains Engineering, (605) 362-3753, Isaac.Anderson@WestPlainsEngineering.com
- Electrical Designer -Todd Baack, West Plains Engineering, (605) 362-3753, Todd.Baack@WestPlainsEngineering.com
Banner Associates, Inc.
409 22nd Avenue South
PO Box 298
Brookings, SD 57006
Phone: (605) 692-6342
Fax: (605) 692-5714
www.BannerAssociates.com
Project number: 23033.00.00
PROBABLE COST FOR BASE BID: $1,500,000 TO $2,000,000
PROBABLE COST FOR BID ALTERNATE 1: $80,000 TO $120,000
One pump station (constructed on-site);
Pump station building construction consists of precast concrete wall panels, hollow core roof structure, and membrane roofing;
All pumps, piping, fittings, flow meters, transmitters, gauges, combination air valves, pressure relief valves, check valves, and telemetry & control system to provide a complete and functioning pump station;
Two (2) vertical turbine pumps with suction vessels and a third suction vessel for a future pump;
All electrical and mechanical systems including a standby generator;
PVC and ductile iron piping connections on inlet and outlet sides of the pump station including fittings, valves, joint restraints, cathodic protection, and concrete thrust blocking;
Site work including, but not limited to, excavation, fill, grading, access road construction, erosion control, and site top-soiling, seeding and restoration;
Installation and wiring of control panel and communications equipment furnished by Owner’s System Integrator (Micro-Comm, Inc.); and
Clean-up and all other miscellaneous work required, not herein mentioned, but inferred from the construction contract documents.
Bid Alternate No. 1: Furnish and install a third vertical turbine pump and VFD, and all necessary equipment and labor to provide a fully functioning third pump as required by the project plans and specifications.