Project Information

Volga 750,000 Gallon Water Tower 2020

BAI Number
23127.00.00
Pre-Bid Meeting Date:
Pre-Bid Meeting Location:
Project Bid Date:
03/16/2021 4:00 PM CST
Project Bid Location:
City of Volga, Finance Officer, PO Box 217, 226 Kasan Avenue, Volga, SD 57071

Bid Schedule(s)

Bid Schedule1
Unit Price Bid Schedule
Probable Cost 1
$2,600,000 to $2,800,000

Project Deadlines 1

Substantial Completion
09/01/2022
Final Completion
11/01/2022

Scope of Work 1

A 750,000 Gallon elevated composite water tower with a height to overflow of 135 feet and all piping, fittings, appurtenances and valves.  The ground floor of the tower will be used as a storage facility and control room;
Site work, yard piping, energy dissipation structure, access road and parking area;
All mechanical, electrical and control equipment necessary to provide a fully functioning facility;
Corrosion protection system components including coatings, linings, and cathodic protection systems;
Temporary and permanent erosion control, reclamation and seeding;
Traffic control during construction;
Reservoir and pipeline cleaning, flushing, hydrostatic pressure testing and disinfection;
Two (2) mixing systems for the new and existing City water towers; and
Clean up, startup services, and all other miscellaneous work required but not herein mentioned but inferred from the construction Contract Documents.
A bid alternate will be evaluated for an alternate logo.

Addendum Dates

Additional Files

Contact Persons:

  • Joe Munson - email, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;
  • Structural - Adam Hanson - email, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;
  • Civil - Beth Niemeyer - email, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;
  • Electrical - Jeremy Nelson - email, Power System Engineering, Inc. , (320) 978-8041
  • Mechanical - Charles DeBerg - email, Power System Engineering, Inc. , (320) 978-8041
  • Contact us about this project