Madison Water System Improvements Phase 1B and Phase 2
Project number: 22831.00.00

Project Bid Date:
04/22/2021
Project Bid Location:
City of Madison, 116 West center Street, Madison, SD 57042

Bid Schedule(s)

Scope of Work 1

SCHEDULE 1

Bid Time: 10:00 AM

Opinion of Construction Costs: $5,980,000

Project Deadlines:

Interim Completion Dates:  August 15, 2021
                                       October 1, 2021
                                       August 15, 2022

Substantial Completion Date: October 1, 2022

Final Completion Date: November 15, 2022

Scope:

Furnish and Install approximately 1,813 LF of 12” diameter, 937 LF of 8” diameter and 5,841 LF of 6” diameter water main and associated service lines;
Furnish and Install approximately 933 LF of 18” diameter, 185 LF of 12” diameter, 398 LF of 10” diameter and 1,994 LF of 8” diameter gravity sewer with associated service lines;
Furnish and Install approximately 210 LF of Bore and Jack 26” Steel Casing Pipe
Furnish and Install approximately 2,387 LF of RCP storm sewer;
Furnish and Install sanitary sewer and water tracer wire systems;
Furnish and Install junction boxes, manholes, valves and appurtenances;
Approximately 30,330 SY of full depth roadway reclamation;
Furnish and Install approximately 14,840 SY of geotextile fabric for subgrade stabilization;
Furnish and Install approximately 21,350 Tons of base course;
Furnish and Install approximately 29,343 SY of asphalt concrete;
Furnish and Install approximately 2,903 SY of PCC approach pavement;
Furnish and Install approximately 12,388 LF of concrete curb & gutter;
Furnish and install approximately 27,217 SF of concrete sidewalk;
Surface restoration and all other miscellaneous work required not herein mentioned, but inferred from the construction Contract Documents.

SCHEDULE 2

Bid Time: 12:00 PM

Opinion of Construction Costs: $455,000

Project Deadlines:

Substantial Completion Date: October 1, 2021

Final Completion Date: November 15, 2021

Scope:

Furnish and Install approximately 3,169 LF of 12” diameter, 120 LF of 8” diameter, and 75 LF of 6” diameter water main;
Furnish and Install approximately 1,424 LF of 12” watermain by directional drill
Furnish and Install water tracer wire systems;
Furnish and Install valves and appurtenances;
Furnish and Install 967 SY of Erosion Control Blanket
Strip, Stockpile and Reinstall approximately 2,264 CY of topsoil
Surface restoration and all other miscellaneous work required not herein mentioned, but inferred from the construction Contract Documents.

SCHEDULE 3

Bid Time: 2:00 PM

Opinion of Construction Costs: $5,033,000

Project Deadlines:

Interim Completion Date: October 1, 2021

Substantial Completion Date: October 1, 2022

Final Completion Date: November 15, 2022

Scope:

Base Bid
Furnish and Install approximately 1,987 LF of 8” diameter and 3,271 LF of 6” diameter water main and associated service lines;
Furnish and Install approximately 137 LF of watermain by directional drill
Furnish and Install approximately 759 LF of 12” diameter, 370 LF of 10” diameter and 1,874 LF of 8” diameter gravity sewer with associated service lines;
Furnish and Install approximately 212 LF of RCP storm sewer;
Furnish and Install sanitary sewer and water tracer wire systems;
Furnish and Install junction boxes, manholes, valves and appurtenances;
Approximately 18,400 SY of full depth roadway reclamation;
Furnish and Install approximately 7,630 SY of geotextile fabric for subgrade stabilization;
Furnish and Install approximately 12,780 Tons of base course;
Furnish and Install approximately 12,510 SY of base course, salvaged asphalt mix, 4” depth;
Furnish and Install approximately 18,221 SY of asphalt concrete;
Furnish and Install approximately 1,306 SY of PCC approach pavement;
Furnish and Install approximately 7,150 LF of concrete curb & gutter;
Furnish and install approximately 13,712 SF of concrete sidewalk;
Surface restoration and all other miscellaneous work required not herein mentioned, but inferred from the construction Contract Documents.
 
Bid Alternate 1
Furnish and Install approximately 1,110 LF of 12” diameter, 60 LF of 10” diameter and 182 LF of 6” diameter water main and associated service lines;
Furnish and Install approximately 558 LF of 8” diameter gravity sewer with associated service lines;
Furnish and Install sanitary sewer and water tracer wire systems;
Furnish and Install manholes, valves and appurtenances;
Approximately 5,490 SY of full depth roadway reclamation;
Furnish and Install approximately 3,180 Tons of base course;
Furnish and Install approximately 6,340 SY of base course, salvaged asphalt mix, 4” depth;
Furnish and Install approximately 5,353 SY of asphalt concrete;
Furnish and Install approximately 236 SY of PCC approach pavement;
Furnish and Install approximately 2,457 LF of concrete curb & gutter;
Furnish and install approximately 5,288 SF of concrete sidewalk;
Surface restoration and all other miscellaneous work required not herein mentioned, but inferred from the construction Contract Documents.
 
Bid Alternate 2
Furnish and Install approximately 1,643 LF of 8” diameter and 180 LF of 6” diameter water main and associated service lines;
Furnish and Install approximately 593 LF of  8” diameter gravity sewer with associated service lines;
Furnish and Install approximately 322 LF of RCP storm sewer;
Furnish and Install sanitary sewer and water tracer wire systems;
Furnish and Install junction boxes, manholes, valves and appurtenances;
Approximately 4,470 SY of full depth roadway reclamation;
Furnish and Install approximately 3,680 SY of geotextile fabric for subgrade stabilization;
Furnish and Install approximately 3,740 Tons of base course;
Furnish and Install approximately 4,730 SY of base course, salvaged asphalt mix, 4” depth;
Furnish and Install approximately 4,382 SY of asphalt concrete;
Furnish and Install approximately 596 SY of PCC approach pavement;
Furnish and Install approximately 2,238 LF of concrete curb & gutter;
Furnish and install approximately 3,777 SF of concrete sidewalk;
Surface restoration and all other miscellaneous work required not herein mentioned, but inferred from the construction Contract Documents.