Project Information

Lewis and Clark Regional Water System – Sheldon Tower

BAI Number
20000.48.01
Pre-Bid Meeting Date:
09/09/2021 2:00 PM CDT
Pre-Bid Meeting Location:
Lewis & Clark Regional Water System Office, 46986 Monty Street, Tea, SD 57064
Project Bid Date:
09/21/2021 2:00 PM CDT
Project Bid Location:
Lewis & Clark Regional Water System, 46986 Monty Street, Tea, SD 57064

Bid Schedule(s)

Bid Schedule1
Lump Sum Bid Schedule
Probable Cost 1
$3,600,000 to $3,800,000

Project Deadlines 1

Substantial Completion
10/13/2023
Final Completion
12/01/2023

Scope of Work 1

A 1.0 million gallon composite water tower with a height to overflow of 145 feet, including foundation and necessary preparatory work.

Ground floor of water tower will include approximately 1,100 SF (sq. ft.) process and cold storage area, including interior piping, valves, and fittings (area depends on pedestal diameter).

All mechanical, electrical and control equipment necessary to provide a fully functioning facility.

Site piping including 16” diameter piping, valves and fittings including corrosion protection.

Site work including but not limited to fill, grading, culverts, energy dissipation structures and access road construction.

Approximately 325 SF of concrete sidewalk and 3,000 SF of aggregate base course and gravel surfacing (areas depend on pedestal diameter).

Temporary and permanent erosion control, fencing, reclamation and seeding.

Traffic control during construction.  And,

Clean-up and start-up services, and all other miscellaneous work required but not herein mentioned but inferred from the construction Contract Documents.

Addendum Dates

Additional Files

Contact Persons:

  • Structural - Adam Hanson - email, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;
  • Electrical - Michael Fisher, West Plains Engineering, (605) 362-3753
  • Mechanical - Connor Swiontek - email, West Plains Engineering, (605) 362-3753
  • Contact us about this project