Lewis and Clark Regional Water System – Lime Sludge Drying Bed Maintenance - Middle Bed
Project number: 21580.10.00
- Pre-Bid Meeting Date:
- 09/17/2020 2:00 PM CDT
- Pre-Bid Meeting Location:
- Lewis & Clark Regional Water System Water Treatment Plant, North of Vermillion, SD at 31474 SD Highway 19, Vermillion, SD 57069
- Project Bid Date:
- 09/22/2020 2:00 PM CDT
- Project Bid Location:
- Lewis & Clark Regional Water System Water Treatment Plant, North of Vermillion, SD at 31474 SD Highway 19, Vermillion, SD 57069
Bid Schedule(s)
- Type 1
- Probable Cost 1
- to
Project Deadlines 1
- Substantial Completion
- 09/01/2021
- Final Completion
- 10/01/2021
Scope of Work 1
BASE BID PROBABLE COST - $400,000
ALTERNATE BID PROBABLE COST - $22,000
BASE BID
- 6,199 CY of unclassified excavation and digout excavation.
- 4,890 CY of scarify and re-compact existing subgrade.
- 47,062 tons of imported clay material to construct drying bed liner and access ramps.
- 525 tons of aggregate surfacing.
- 1,843 LF of 6” drain pipe and associated bedding and drainage fabric.
- Construct a vehicle construction entrance.
- 806 CY of Topsoil Placement
- One acre of reclamation and seeding.
- 2,500 SY of erosion control blanket.
- 3,880 tons of Remove and Stockpile Lime Sludge (Alternate 1)
- Clean-up and all other miscellaneous work required, not herein mentioned, but inferred from the construction Contract Documents
ALTERNATE BID
- 3,880 tons of Remove and Stockpile Lime Sludge (Alternate 1)
- Cleanup and all other miscellaneous work required, not herein mentioned but inferred for the construction Contract Documents.
Addendum Dates
- 09/18/2020 Memo Faxed - Click here to download
Additional Files
- Soils Report Dated 6/8/06 (09/10/2020)
- Soils Report Dated 11/19/03 (09/10/2020)
- Soils Report Dated 12/20/04 (09/10/2020)
- Monitoring Well Site Map (09/10/2020)
- Monitoring Log (09/10/2020)
- Soil Proctor Report (09/10/2020)
Contact Persons:
- Civil - Weston Blasius, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;, westonb@bannerassociates.com
- Tim Conner, Banner Associates, Inc., (605) 692-6342 or 1-855-323-6342;, timc@bannerassociates.com
Banner Associates, Inc.
409 22nd Avenue South
PO Box 298
Brookings, SD 57006
Phone: (605) 692-6342
Fax: (605) 692-5714
www.BannerAssociates.com
Project number: 21580.10.00
BASE BID PROBABLE COST - $400,000
ALTERNATE BID PROBABLE COST - $22,000
BASE BID
- 6,199 CY of unclassified excavation and digout excavation.
- 4,890 CY of scarify and re-compact existing subgrade.
- 47,062 tons of imported clay material to construct drying bed liner and access ramps.
- 525 tons of aggregate surfacing.
- 1,843 LF of 6” drain pipe and associated bedding and drainage fabric.
- Construct a vehicle construction entrance.
- 806 CY of Topsoil Placement
- One acre of reclamation and seeding.
- 2,500 SY of erosion control blanket.
- 3,880 tons of Remove and Stockpile Lime Sludge (Alternate 1)
- Clean-up and all other miscellaneous work required, not herein mentioned, but inferred from the construction Contract Documents
ALTERNATE BID
- 3,880 tons of Remove and Stockpile Lime Sludge (Alternate 1)
- Cleanup and all other miscellaneous work required, not herein mentioned but inferred for the construction Contract Documents.