Lake Norden WWTF and North Lift Station Improvements

BAI Number
23515.00
Project Bid Date:
09/27/2022 2:00 PM
Project Bid Location:
City of Lake Norden, 508 Main Avenue, Lake Norden, SD 57248

Bid Schedule(s)

Scope of Work 1

*Bid schedules will be awarded individually and Bidders may submit bids for one or both schedules.*

Bid Schedule 1: Unit Price Bid Schedule, probable cost $2.4-2.6 million
Bid Schedule 2: Unit Price Bid Schedule , probable cost $2-2.2 million

Bid Schedule 1: Lake Norden WWTF Pond Improvements

Stabilization of dike wall with approximately 18,700 cubic yards of new clay liner and 22,100 tons of riprap for four wastewater treatment lagoons. 
Replace 12 valves and 300 square yards of concrete headwalls.
Furnish and install approximately 9,500 lineal feet of new perimeter fence

Bid Schedule 2: Lake Norden North Lift Station and Gravity Sewer Improvements

Furnish and install 8’ dia. lined, precast submersible lift station with 6’ by 10’ precast valve vault with pumps, fitting and appurtenances.
Furnish and install electrical equipment for lift station including control panel and enclosures, new electrical feeder to lift station from water treatment plant, and fiber optic communication cable to water treatment plant.
Removal of existing North Lift Station and control panel.
Integration of North Lift Station control into Water Treatment Plant SCADA system
Furnish and install approximately 980 LF of 6-inch dia. PVC forcemain, sanitary manholes, tracer wire, and appurtenances.
Furnish and install approximately 1,100 LF of 18-inch dia. PVC gravity sewer, sanitary manholes, tracer wire, and appurtenances.
Furnish and install approximately 900 LF of 6-inch dia. PVC watermain, valves, tracer wire, and appurtenances.
Replace base elbow guiderail system, pump lifting chains, and piping in the existing Discharge Lift Station.
Paving on Park St. and 5th Ave. including
Approximately 3 blocks of street reconstruction and new surfacing.
Approximately 4,800 SY of Geosynthetic Geogrid.
Approximately 3,000 Tons of Gravel Base Course.
Approximately 850 Tons of Hot Mix Asphalt Pavement.
Approximately 2,100 LF of Concrete Curb & Gutter and miscellaneous concrete surfacing items.

Bid Schedule 1 – Lake Norden WWTF Pond Improvements

The Work will be substantially completed on or before September 1, 2023, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before November 1, 2023. The work required for substantial completion and final completion is defined in Specification Section 01 0000 General Requirements.

Bid Schedule 2 – Lake Norden North Lift Station and Gravity Sewer Improvements

The Work will be substantially completed on or before September 1, 2023, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before November 1, 2023. The work required for substantial completion and final completion is defined in Specification Section 01 0000 General Requirements.

Addendum Dates

Additional Files

Contact Persons:

  • Instrumentation and Controls - Deidre Beck - email, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;
  • Civil - Beth Niemeyer - email, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;
  • General, Lift Station & Controls - Dennis Rebelein - email, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;
  • Civil - Todd Schultz - email, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;
  • Electrical - Josh Mulder, Power System Engineering, Inc. , (320) 978-8041