Clark Rural Water System – Bradley Water System Improvements
Project number: #22825.00.00
- Project Bid Date:
- 07/12/2019 11:00 AM CST
- Project Bid Location:
- Clark Rural Water System, 1001 1st Avenue W., Clark, SD 57225
Bid Schedule(s)
- Type 1
- Unit Price Bid Schedule
- Probable Cost 1
- 700,000.00 to 900,000.00
Project Deadlines 1
- Substantial Completion
- 07/31/2020
- Final Completion
- 09/13/2020
Scope of Work 1
Construction of approximately 10,800 linear feet of 4-inch diameter water main;
Construction of approximately 2,260 linear feet of 1.5-inch Sch 40 PVC service pipe;
Furnish and installation of necessary valves, fittings, joint restraints and concrete thrust blocks to provide a complete and functioning potable water main;
Culvert replacement;
Installation of 61 owner-furnished meter pits;
Furnish and place approximately 855 tons of base course material, approximately 442 tons of asphalt concrete to repair trenches in streets, and approximately 152 square yards of concrete sidewalk to repair trenches in the street;
Temporary and permanent erosion control, reclamation and seeding;
Traffic control per MUTCD standards;
Water main flushing, hydrostatic pressure testing and disinfection; and
Clean up, startup services, and all other miscellaneous work required but not herein mentioned but inferred from the construction Contract Documents.
Addendum Dates
- 07/03/2019 Memo Faxed - Click here to download
Contact Persons:
- Process - Bryan Lipp, Banner Associates, Inc. (Brookings Office), (605) 692-6342 or 1-855-323-6342, bryanl@bannerassociates.com
- Drawings - Brandon Smid, Helms & Associates,, 605-225-1212, brandons@helmsengineering.com
Banner Associates, Inc.
409 22nd Avenue South
PO Box 298
Brookings, SD 57006
Phone: (605) 692-6342
Fax: (605) 692-5714
www.BannerAssociates.com
Project number: #22825.00.00
Construction of approximately 10,800 linear feet of 4-inch diameter water main;
Construction of approximately 2,260 linear feet of 1.5-inch Sch 40 PVC service pipe;
Furnish and installation of necessary valves, fittings, joint restraints and concrete thrust blocks to provide a complete and functioning potable water main;
Culvert replacement;
Installation of 61 owner-furnished meter pits;
Furnish and place approximately 855 tons of base course material, approximately 442 tons of asphalt concrete to repair trenches in streets, and approximately 152 square yards of concrete sidewalk to repair trenches in the street;
Temporary and permanent erosion control, reclamation and seeding;
Traffic control per MUTCD standards;
Water main flushing, hydrostatic pressure testing and disinfection; and
Clean up, startup services, and all other miscellaneous work required but not herein mentioned but inferred from the construction Contract Documents.