USD Burgess/Norton Parking Lot 5 Expansion

USD Burgess/Norton Parking Lot 5 Expansion

Location

Vermillion, SD

Construction Cost

$904,550

Previous Next

Parking on university campuses is always at a premium. The University of South Dakota looked to increase the capacity of their existing facilities with the expansion of the Burgess/Norton Parking Lot 5. One of the project constraints was that parking facility must be removed and replaced in the short time window of summer break. With poor subgrade soils in Vermillion, USD was seeking a solution to improve the subgrade and ensure the project was not delayed due to costly and time consuming subgrade improvement methods. Banner proposed utilizing soil cement stabilized subgrade to provide a consistent and strong subgrade that ensures the project remained on schedule.  The University also took this opportunity to improve pedestrian access routes around the parking lot and bring the areas up to ADA requirements. New lighting was incorporated into the design that, combined with Portland Cement Concrete surfacing, provides enhanced lighting and security to the site. The contractor used GPS based equipment to grade the subgrade and base course as well as install the concrete surfacing. This technology proved to reduce construction time as well. Banner checked surfaces created by the contractor to ensure design grades and elevations were met. The final product provided double the parking capacity just in time for the fall semester.  Banner provided topographic surveying, preliminary/final design, bidding, construction administration and construction staking.

Checkmark Icon

Project Goal #1

Provide a parking facility that provides at least 190 parking stalls. 

Checkmark Icon

Project Goal #2

Provide a cement stabilized subgrade.

Checkmark Icon

Project Goal #3

Provide sidewalk that can be easily maintained with University maintenance equipment and does not conflict with parking lot motorists.

Checkmark Icon

Project Goal #4

Provide lighting for the parking facility.

Checkmark Icon

Project Goal #5

Provide improved access from City/University Streets.

Checkmark Icon

Project Goal #6

Construct the project during the 2019 summer break to accommodate students upon return for Fall 2019 semester.

Checkmark Icon

Project Goal #7

Make ADA upgrades to pedestrian access routes.

Project Features

  • 199 parking stalls with ADA parking and access aisles
  • Approximately 71,500 SF of cement stabilized subgrade
  • Approximately 6,800 SY of 5" PCC pavement
  • Approximately 275 LF of 12" RC Storm Pipe and 3 drop inlets
  • Approximately 1,100 LF of concrete curb and gutter
  • Approximately 16,400 SF of reinforced concrete sidewalk
  • 6 Parking Lot Double Head Light Fixtures

Services Provided

  • Topographic Survey
  • Preliminary/Final Design
  • Bidding
  • Construction Administration
  • Construction Staking