The City of Rapid City constructed a new drainage channel in an area of highly unstable soils. The existing channel was severely degraded and undersized. The purpose of the project was to reduce sediment transport (improving Storm Water Quality), reduce localized flooding to area businesses, and conveyance of storm water. 

Checkmark Icon

Project Goal #1

Reduce erosion of unstable soil

Checkmark Icon

Project Goal #2

Reduce localized flooding

Project Features

  • 420 LF of cast-in-place concrete drainage channel
  • Concrete drop-structure
  • 450 CY of riprap

Services Provided

  • Preliminary/Final Design
  • Construction Documents