Clear Lake Sanitary Sewer Improvements

Clear Lake Sanitary Sewer Improvements

Location

Clear Lake, SD

Construction Cost

$ 2,550,134

Previous Next

The City of Clear Lake Sanitary Sewer Improvements project used a trenchless construction method known as Cured-in-Place Pipe (CIPP) to eliminate inflow/infiltration (I/I) problems. The project included approximately 24,000 feet of mainline lining and 12,900 feet of lateral lining with 380 main line/lateral connections and lateral lining cleanouts. The project also included replacing several manholes and rehabilitation of an existing lift station wet well with a fiberglass liner insert. The project was completed in 2016. Banner assisted the City in securing funding for the project through the facility planning process.

Checkmark Icon

Project Goal #1

Reduce hydraulic overloading (I/I) of the wastewater treatment facility

Checkmark Icon

Project Goal #2

Reduce street repair costs by using a trenchless construction method allowing the City to spend more dollars on upgrading their wastewater collection system

Project Features

  • Sanitary Sewer Main Collection Lines - CIPP
  • Sanitary Sewer Main Collection Line/Lateral Connections - CIPP
  • Sanitary Sewer Laterals to ROW - CIPP
  • Sanitary Sewer Manhole Installation - Precast Concrete
  • Lift Station Wet Well Rehabilitation - Fiberglass Liner

Services Provided

  • Facility Plan Preparation
  • Wastewater Collection Main Line Evaluation
  • Assist 1st District of Local Governments with securing project funding
  • Preliminary/Final Design Plans
  • Final Project Manual and Drawings for Bidding
  • Bidding Services
  • Construction Administration and Resident Project Representative

Support Disciplines