Beresford, SD

Construction Cost

$ 1,200,000

Previous Next

Highway 46 through Beresford was reconstructed for a one mile segment from West 13th Street to East 13th Street as part of a joint SDDOT/City highway reconstruction project. For this project, the city utility replacement work was bid as a separate schedule by the SDDOT in order to award the construction work to a single contractor. The City and Banner worked in conjunction with the SDDOT to replace aging municipal sanitary sewer and water main utilities under the highway. During the design phase, much attention was paid to sequencing since the SDDOT required that traffic be maintained during construction by allowing only half of the roadway to be closed at one time.

Checkmark Icon

Project Goal #1

Replace an aging sanitary sewer collection and water distribution system

Checkmark Icon

Project Goal #2

Coordinate utility replacement with SDDOT highway reconstruction

Project Features

  • PVC gravity sanitary sewer
  • PVC water main

Services Provided

  • Facility Plan Preparation
  • Topographic Surveying
  • Preliminary / Final Design
  • Construction Administration, Staking and Observation