Bid Letting Information
Banner Associates, Inc.
409 22nd Avenue South
PO Box 298
Brookings, SD 57006
Phone: (605) 692-6342
Fax: (605) 692-5714
www.BannerAssociates.com
Vermillion Jefferson Street Improvements
Project number: 22662.00.00
- Project Bid Date:
- 04/11/2018 2:00 PM CDT
- Project Bid Location:
- City Hall, 25 Center Street, Vermillion, SD 57069
Bid Schedule(s)
- Type 1
- Probable Cost 1
- to
Scope of Work 1
Project is being bid by City of Vermillion Engineering Department. Bidding information can be found at this Website:
https://www.vermillion.us/bids.aspx
Bid Schedule - Unit Price Bid Schedule; Probable Cost - $835,000
Approximately 7,600 SY of full depth asphalt reclamation;
Approximately 87,000 SF of cement treated subgrade;
Approximately 9,300 SY of 7” PCC Paving;
Approximately 1,425 LF of concrete curb and gutter;
Approximately 4,700 SF of concrete flatwork;
Approximately 300 LF of 12” and 15” diameter concrete storm pipe and 7 drop inlets; and
Surface restoration and general erosion control.
Bid Alternate - Unit Price Bid Schedule; Probable Cost - $160,000
Remove approximately 10,700 SY of existing soil cement;
Approximately 10,700 SY of soil cement mixing, spreading, compacting, and curing
Addendum Dates
Banner Associates, Inc.
409 22nd Avenue South
PO Box 298
Brookings, SD 57006
Phone: (605) 692-6342
Fax: (605) 692-5714
www.BannerAssociates.com
Project number: 22662.00.00
Project is being bid by City of Vermillion Engineering Department. Bidding information can be found at this Website:
https://www.vermillion.us/bids.aspx
Bid Schedule - Unit Price Bid Schedule; Probable Cost - $835,000
Approximately 7,600 SY of full depth asphalt reclamation;
Approximately 87,000 SF of cement treated subgrade;
Approximately 9,300 SY of 7” PCC Paving;
Approximately 1,425 LF of concrete curb and gutter;
Approximately 4,700 SF of concrete flatwork;
Approximately 300 LF of 12” and 15” diameter concrete storm pipe and 7 drop inlets; and
Surface restoration and general erosion control.
Bid Alternate - Unit Price Bid Schedule; Probable Cost - $160,000
Remove approximately 10,700 SY of existing soil cement;
Approximately 10,700 SY of soil cement mixing, spreading, compacting, and curing
No Addendums
Additional Files
- Soils Report (04/09/2018)
Contact Persons:
- General - Jose Dominguez, City of Vermillion, (605) 677-7083,
- Civil - Rich Uckert, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;, richu@bannerassociates.com