Madison Water System Improvements - 750,000 Gallon Water Tower
- BAI Number
- #22831.00.30
- Project Bid Date:
- 08/11/2020 11:00 AM CST
- Project Bid Location:
- City of Madison, 116 West center Street, Madison, SD 57042
Bid Schedule(s)
Scope of Work 1
A 750,000 Gallon elevated water tower with a height to overflow of 142’-4” feet and all piping, fittings, appurtenances and valves. The ground floor of the tower will be used as a storage facility and control room;
Site work, yard piping, energy dissipation structure, gravel surfaced access road and parking area;
All mechanical, electrical and control equipment necessary to provide a fully functioning facility;
Corrosion protection system components including coatings, linings, and cathodic protection systems;
Temporary and permanent erosion control, reclamation and seeding;
Traffic control and haul road maintenance during construction;
Reservoir and pipeline cleaning, flushing, hydrostatic pressure testing and disinfection; and
Clean up, startup services, and all other miscellaneous work required but not herein mentioned but inferred from the construction Contract Documents.
Addendum Dates
- 08/06/2020 Memo Faxed - Click here to download
Additional Files
- Geotek Report - Proposed Water Tower (07/20/2020)
Contact Persons:
- Process - Kristin Bisgard - email, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;
- Civil - Beth Niemeyer - email, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;
- Electrical - Mark Joffer - email, PE Group, 605-297-3647
- Mechanical - Jonathon R. Giles - email, Innovative Engineering Solutions, 605-366-9457
- Contact us about this project