Lewis & Clark Regional Water System - Rock County Pump Station & Meter Buildings
Project number: 20000.31.01

Pre-Bid Meeting Date:
08/30/2016 2:00 PM CDT
Pre-Bid Meeting Location:
Lewis & Clark Regional Water System, 46986 Monty Street, Tea, SD 57064
Project Bid Date:
09/08/2016 2:00 PM CDT
Project Bid Location:
Lewis & Clark Regional Water System, 46986 Monty Street, Tea, SD 57064

Bid Schedule(s)

Type 1
Unit Price Bid Schedule
Probable Cost 1
$3,500,000 to

Scope of Work 1

A new main line booster pump station (constructed on-site).  The Rock County Pump Station will include pumps and piping for current conditions and provisions for adding pumps in the future;

A new meter building (constructed on-site).  The Adrian Meter Building will include pumps and metering facilities for the Lincoln-Pipestone RWS connection;

The new buildings will include all piping, fittings, pumps, motors, VFDs, meters, gauges, valves, generators, and metering appurtenances including but not limited to isolation valves, control valves, combination air valves, check valves, chemical feed and storage systems, and telemetry & control systems;

The new buildings will include all electrical and mechanical equipment and systems;
Site work at the new buildings includes, but is not limited to excavation, fill, grading, lighting, utilities, access road construction, fencing and site topsoiling, seeding and restoration;

PVC site piping connections on inlet and outlet sides of the buildings including corrosion protection (galvanic anodes);

Sanitary sewer piping and connections to septic systems;

Upgrades to existing meter building.  The existing Dove Avenue Meter Building included provisions to add pumps for the Rock Rapids, IA.  Pumps, motors, VFD’s, fittings, piping, valves, equipment, electrical and mechanical systems will be upgraded; and Clean up and all other miscellaneous work required, not herein mentioned, but inferred from the construction contract documents.

                Substantial Completion

                                November 17, 2017 – Adrian Meter Building

                                March 23, 2018 – Rock County Pump Station

                                March 23, 2018 – Dove Avenue Meter Building Upgrades

                 Final Completion

                                June 1, 2018 – Adrian Meter Building

                                June 1, 2018 – Rock County Pump Station

                                June 1, 2018 – Dove Avenue Meter Building Upgrades