Bid Letting Information
Banner Associates, Inc.
409 22nd Avenue South
PO Box 298
Brookings, SD 57006
Phone: (605) 692-6342
Fax: (605) 692-5714
www.BannerAssociates.com
Lewis and Clark Regional Water System - Wellfield Bank Stabilization Project
Project number: 20000.37.01
- Pre-Bid Meeting Date:
- 05/11/2017 2:00 PM CDT
- Pre-Bid Meeting Location:
- Lewis & Clark Water Treatment Plant, 31476 SD Highway 19, Vermillion, SD 57069
- Project Bid Date:
- 05/23/2017 2:00 PM CDT
- Project Bid Location:
- Lewis & Clark Regional Water System, 46986 Monty Street, Tea, SD 57064
Bid Schedule(s)
Scope of Work 1
Base Bid (Schedule 1, 2 & 3) $1,300,000.00 to $1,700,000.00
PROJECT DEADLINES: Base Bid - Schedule 1 - Substantial Completion: 7/28/2017
Base Bid - Schedule 2 - Substantial Completion: 10/13/2017
Base Bid - Schedule 3 - Substantial Completion: 12/31/2017
Final Completion (All Schedules): 5/15/2018
Bid Alternate (Schedule 4) $300,000.00 to $400,000.00 PROJECT DEADLINES: Substantial Completion: 12/31/2017 - Final Completion 5/15/2018
Bank stabilization repair of approximately 500 feet of existing stone toe revetment (Base Bid - Schedule 1);
Phase 1 bank stabilization extension of approximately 1,100 feet of Missouri River backwater area (Base Bid - Schedule 2);
Phase 2 bank stabilization extension of approximately 500 feet of Missouri River backwater are (Base Bid - Schedule 3);
Phase 3 bank stabilization extension of approximately 650 feet of Missouri River backwater area (Bid Alternate - Schedule 4);
Temporary and permanent erosion control, reclamation and seeding; and
Clean up and all other miscellaneous work required, not herein mentioned, but inferred from the construction Contract Documents.
Addendum Dates
- 05/16/2017 Memo Faxed - Click here to download
Additional Files
- Pre-Bid Meeting Minutes May 11, 2017 (05/16/2017)
Contact Persons:
- Daniel Graber, HDR Engineering, Inc., (605) 977-7767,
- Tim Conner, Banner Associates, Inc., (605) 692-6342 or 1-855-323-6342;, timc@bannerassociates.com
Banner Associates, Inc.
409 22nd Avenue South
PO Box 298
Brookings, SD 57006
Phone: (605) 692-6342
Fax: (605) 692-5714
www.BannerAssociates.com
Project number: 20000.37.01
Base Bid (Schedule 1, 2 & 3) $1,300,000.00 to $1,700,000.00
PROJECT DEADLINES: Base Bid - Schedule 1 - Substantial Completion: 7/28/2017
Base Bid - Schedule 2 - Substantial Completion: 10/13/2017
Base Bid - Schedule 3 - Substantial Completion: 12/31/2017
Final Completion (All Schedules): 5/15/2018
Bid Alternate (Schedule 4) $300,000.00 to $400,000.00 PROJECT DEADLINES: Substantial Completion: 12/31/2017 - Final Completion 5/15/2018
Bank stabilization repair of approximately 500 feet of existing stone toe revetment (Base Bid - Schedule 1);
Phase 1 bank stabilization extension of approximately 1,100 feet of Missouri River backwater area (Base Bid - Schedule 2);
Phase 2 bank stabilization extension of approximately 500 feet of Missouri River backwater are (Base Bid - Schedule 3);
Phase 3 bank stabilization extension of approximately 650 feet of Missouri River backwater area (Bid Alternate - Schedule 4);
Temporary and permanent erosion control, reclamation and seeding; and
Clean up and all other miscellaneous work required, not herein mentioned, but inferred from the construction Contract Documents.