Beresford 300,000 Gallon Water Tower Coating - 2019
Project number: #22942.00.00
- Project Bid Date:
- 07/11/2019 2:00 PM CDT
- Project Bid Location:
- City of Beresford, 101 N. Third Street, Beresford, SD 57004
Bid Schedule(s)
Project Deadlines 1
- Substantial Completion
- 06/30/2020
- Final Completion
- 07/31/2020
Scope of Work 1
Surface preparation and recoating of interior of 300k gallon fluted-column elevated water storage tank. Tower interior shall be blasted to SSPC-SP5 “White Metal Blast”, zinc-rich primer, epoxy stripe coat, and epoxy top coat;
Surface preparation and recoating of exterior of 300k gallon fluted-column elevated water storage tank. Tower exterior shall be blasted to SSPC-SP10 “Near-White Metal Blast”, zinc-rich primer, polyurethane stripe coat, polyurethane intermediate coat and fluoropolymer top coat;
Extend overflow pipe to grade and install flap gate;
Replace roof hatch gasket;
Substantially complete all work on existing 300k gallon fluted-column elevated water storage tank by June 30, 2020.
Addendum Dates
- 07/03/2019 Memo Faxed - Click here to download
Contact Persons:
- Structural - Adam Hanson, Banner Associates, Inc. , (605) 692-6342 or 1-855-323-6342;, adamh@bannerassociates.com
Banner Associates, Inc.
409 22nd Avenue South
PO Box 298
Brookings, SD 57006
Phone: (605) 692-6342
Fax: (605) 692-5714
www.BannerAssociates.com
Project number: #22942.00.00
Surface preparation and recoating of interior of 300k gallon fluted-column elevated water storage tank. Tower interior shall be blasted to SSPC-SP5 “White Metal Blast”, zinc-rich primer, epoxy stripe coat, and epoxy top coat;
Surface preparation and recoating of exterior of 300k gallon fluted-column elevated water storage tank. Tower exterior shall be blasted to SSPC-SP10 “Near-White Metal Blast”, zinc-rich primer, polyurethane stripe coat, polyurethane intermediate coat and fluoropolymer top coat;
Extend overflow pipe to grade and install flap gate;
Replace roof hatch gasket;
Substantially complete all work on existing 300k gallon fluted-column elevated water storage tank by June 30, 2020.